“The Russians have taken the existence of tectonic plates into consideration in designing the Bushehr nuclear plant.”-Nasser Rastkhah, Atomic Energy Organization of Iran
Recently Russia helped Iran with loading of nuclear fuel rods into their plant. The Bushehr nuke plant is scheduled to power up by May. ‘Sensitive phases of operation’ would be conducted between May 5 through May 10.