TEPCo restores cooling at Fukushima Daiichi

20 March 2013/08 Jumada l-Ula 1434/30 Esfand 1391/09 Yi-Mao (2nd month) 4711

Tokyo Electric Power Company claims they’ve restored cooling to spent fuel pools.  They still are not sure what caused the outside electric supply to stop.  They suspect a surge tripped three high voltage distribution panels.  After replacement and inspection they could find no signs of damage on the panels.